Tony,
Up grading King Air Collins EFIS to WAAS...

|
Larry,
Checking out autopilot install Wiring.

|
Aero
Commander Updating flight guidance and pilots panel

|
Aero
Commander Panel before up grade

|
Approved
Aero Commander Left Panel layout & placcarding.

|
|
|
Tony
Getting nose area organized in the Aero Commander

|
Aero
Commander Pilots Panel removed & initial Autopilot
wiring.

|
Aero
Commander parcel interior removed for Autopilot wiring.

|
|
|
Approved
pedestal panel layout & placcarding.

|
Original
pedestal panel refurbushed.

|
Aero
Commander, Wiring progress hard to measure....

|
|
|
Aero
Commander Autopilot Pitch & Trim Servos.

|
Commander
S-Tec Autopilot Roll Servo mounting bracket.

|
Pilots
panel, final "fit" test before paint & screening..

|
|
|
Aspen
AHRS sensor..

|
Pilots
panel installed, next populate with flight instruments..

|
Future
Gulfstream Commander Progress..
|
|
|
Beechcraft
Bonanza, Panel To be up-dated to electronic glass....

|
Bonanza
Panel as was before the transformation process.....

|
In
the Beginning there was a "6Pack" the process
has begun....

|
|
|
Beechcraft
Bonanza, Preliminary Floating Panel Layout...

|
Aspen AHRS (Attitude Heading Reference System) Sensor..

|
Bonanza
Center Stack ..

|
|
|
Beechcraft
Bonanza, Stack and stack wiring 80% Complete...

|
Blank
modified late Bonanza (top) to fit early (lower) Bonanza
panel...

|
Checking
instrument form and fit Aspen flush mounted..

|
|
|
Color
matched and ready for placcard screening.

|
Pilots
Panel Preliminary graphics

|
Pilots
Panel installed

|
|
|
Bonanza
post testing and alignment, completed pilots panel.

|
Parcel
Garmin/King stack installed in refurbished mount.

|
Completed
Panel, added recessed aspen, Garmin audio and GNS 530.

|
|
|
Malibu
Mirage panel upgrading .....

|
Mirage pilots panel soon to be Garminized. Left Click
for details.

|
Malibu
Mirage Preliminary Rev "A" Pilots panel....

|
|
|
Malibu
Mirage New panels required when moving to Garmin Glass
.....

|
Mirage wiring and mounting trays, Click for air frame
progress

|
Let
the metamorphose begin, from cyber ware to hardware

|
|
|
Malibu
cut panel

|
Preliminary
panel fitting to check dimensional characteristic

|
Preliminary
panel fitting with partial instrumentation installed

|
|
|
EDM 930 Bezel, fabricated to mimic the Garmin.

|
Proposed
Panel Placcarding.

|
Panel
Components EDM 930/Bezel GWD620 and tray mounting brackets

|
|
|
Silk
Screening Complete

|
Wiring
95% complete Final assembly Beginning!

|
Mirage
progress, power up and preliminary checks aheadt....

|
|
|
Mirage
Testing & Programing process....

|
Preliminary
testing & programing complete, fine tuning left.
|
Completed
installation....

|
|
|
Malibu,
Installation of Garmin G600/GTN750/650

|
Pilots
new panel, Click on picture to see progress to date.

|
Malibu
Rear Avionics Rack.

|
|
|
Malibu,
Pilots Panel cut and ready for inspection

|
Tony,
checking harness placement, click for detailed picture.

|
Malibu,
cut pilots panel installed to check clearances.

|
|
|
Malibu
pilots panel final clearance check before powder coating.

|
Malibu,
center panel soon to be filled with Garmin & Avidyne
.

|
Malibu,
center panel lay out Click for prospective view.
.
|
|
|
|
|
|
|
|
Malibu
Center Stack Right Side Rear Support Brackets

|
Malibu,
center stackl, testing clearances Click for details.

|
Malibu
Center Stack Mounted and & wired.Ready for pre. testing..

|
|
|
Malibu
Center Stack Right Side Rear Support Brackets

|
Malibu
Initial power up & Preliminary testing left click
for detail photo

|
Malibu
Post flight test. Left click for before/after.

|
|
|
|
|
|
|
|
Beechcraft
A36 Bonanza Panel Up Grade to Garmin Avionics

|
Old
Avionics to soon to be removed.

|
Removing
old avionics, preparing for Garmin G500/GNT650..

|
|
|
|
|
|
|
|
Bonanza
N3802P Design of Pilots floating Panel.

|
Transforming
design into reality

|
N3802P
Pilots panel cut out, Garmin 500 PDF.

|
|
|
N3802P
Pilots panel prelminary checkout.

|
N3802P
Radio Stack mounted in Beechcraft panel..

|
N3802P
Radio Stack Power coated with rear support shown

|
|
N3802P
Right side of panel completed.

|
N3802P
Pilots panel Powder Coated & Screened.

|
3802P
AFT Avionics Bay. Left Click for final pilots panel

|
|
|
Piper
PA 32RT-300 Aspen, Garmin GTN 750, SL30, GTX 33 Install.

|
Piper
PA 32RT-300 Testing Auto-Dimming

|
|
|
|
Rnav
Star 5000 to be removed, replaced GNS 430 WAAS

|
Fabracate
mount for GNS430 WAAS.

|
|
|
GNS
430 WAAS Mounted under pilots panel.

|